FDI Managment and Services in India

Buy Project Reports

PROJECT FEASIBILITY TO MANUFACTURE PSF NON WOVEN PADDING/WADDIN
PROJECT FEASIBILITY TO MANUFACTURE  PSF NON WOVEN PADDING/WADDIN
$215.00



PLASTIC COMPOUNDING (RESIN) FOR ENGINEERING COMPONENTS MFG).
PLASTIC COMPOUNDING (RESIN) FOR  ENGINEERING COMPONENTS MFG).
$142.00



PROJECT FEASIBILITY TO MANUFACTURE/ AND DEVELOPMENT OF COMPUTER
PROJECT FEASIBILITY TO MANUFACTURE/ AND  DEVELOPMENT OF COMPUTER
$142.00



MINI TELE MARKETING AND CUSTOMER CARE (SUPPORT) SERVICES UNIT T
MINI TELE MARKETING AND CUSTOMER  CARE (SUPPORT) SERVICES UNIT T
$210.00



FEASIBILITY REPORT FOR THE MANUFACTURE AND MARKETING OF THERMO-P
FEASIBILITY REPORT FOR THE MANUFACTURE AND MARKETING OF THERMO-P
$142.00



Capability

Capability
We accomplish all by doing the spade work required.  Pre-feasibility carried out to find the economic and marketing viability of the proposed project. To prepare Project Reports following elements are needed:


1. Identification of the right product to be manufactured and its market visa vies to existing units in the field meeting the demand and its present import to find the scope of investment.

2. Selection of location suitable for the proposed Project both from raw material availability and from the marketing point of view and from licensing point of view.

3. Identify the Sources of funds required for the implementation of the project to prepare the feasibility.

4. Formation of company which shall implement the project, which may be sole propriety or, Private limited or Partnership and may be public limited depending upon your investment.

5. Open the Bank Account after the entity is formed and the documents are accepted.

6. Completion the statuary work required for the Registration of the unit with the appropriate authorities.

7.  Obtain necessary I/E Cod for use in import and export activities, sale/excise and VAT Registration the basis of location and product to be manufactured.

8. Arranging for details of site layout, building size required with necessary infrastructure and Administrative blocks with civil work estimates and the price of the land taken into account...

9.  Technology availability has to be identified either to be obtained from abroad or locally viz. To with market strategy.

10. Search necessary equipment required for a viable capacity to be established with detailed specifications of the plant & machinery and other process equipments, including the auxiliary service required, prepare comparative chart with additional facilities available.

11. Place orders for plant & machinery to be obtained from national and international/local level.)

12. Arrange sanction of the Power and water connection...

13. Arrange Architect for the construction and supervision of the proposed building as per machinery to be installed plus Adman. Block...

14. Estimates if raw material and consumable requirement and source of procurement and placement of orders...

15. Organizational structure and manpower planning and recruitments for training on the job.

16. Optimizing Project Cost.

17. Financial projection and sensitivity studies. Carried.

18. Implementation schedule along with PERT Chart

19. Trial Production for quality check with specifications

20. Commercial Production.

 
You are here: Home Capability